On October 28, the production and Business Department of the SIPG Group issued a notice saying that due to the upgrade of the Waigaoqiao Port area system, the total amount of the container business needs to be controlled from November 3 to 8, and the specific measures are as follows:
1. The container loading business from November 3 to 8 can be arranged appropriately in advance. For the specific time, please pay attention to the opening time of ships at each port published on the website of SIPG.
2, from November 3 to 8, all the pick-up business must be booked in advance, and the successful collection card can come to the port for pick-up operation.